Payables conversion · EN PDF → Cloud Accounting
Subcontractor Stage Valuation Invoice PDF to Xero Bills CSV, penny-exact.
Extracts header metadata and line items from a Subcontractor Stage Valuation Invoice PDF (English (Construction Stage Application & Retention)), verifies minor-unit row extensions and tax totals (£4,800.00 Valuation − £240.00 (5% Retention) = £4,560.00 certified net), and formats an UTF-8 Xero Bills Import CSV for Xero › Business › Bills to pay › Import.
- Source PDF
- Subcontractor Stage Valuation Invoice PDF
- Target schema
- Xero Bills Import CSV
- Delimiter & encoding
- Comma (,) · UTF-8
- Number rule
- £4,800.00 Valuation − £240.00 (5% Retention) = £4,560.00 certified net
- Import path
- Xero › Business › Bills to pay › Import
Illustrative specimen · Sample values
Input PDF rows & resulting CSV output.
Below is an illustrative example using fictional supplier rows in English (Construction Stage Application & Retention) format alongside the exact Xero Bills Import CSV header and data rows produced by the converter.
01 · Source PDF table excerpt
Aire Valley M&E Contracting Ltd — Valuation Invoice VAL-04-2026
Certificate Date: 2026-10-25 · Due: 2026-11-24 · 5% Retention Held
| Ref | Item Description | Qty | Rate | VAT % | VAT Amount | Net Amount |
|---|---|---|---|---|---|---|
| PKG-ME04 | Valuation 4 - First-Fix Containment & Distribution | 1 | £4,800.00 | 20% | £960.00 | £4,800.00 |
| RET-05 | Less 5% Contract Retention Held to Practical Completion | -1 | £240.00 | 20% | -£48.00 | -£240.00 |
✓ Certified Net £4,560.00 + VAT £912.00 = Amount Due £5,472.00 · Reconciled
02 · Generated Xero Bills CSV output (subcontractor-stage-valuation-xero-bills.csv)
Multi-line bills repeat *ContactName, *InvoiceNumber, *InvoiceDate and *DueDate on every CSV row; Xero groups lines sharing *InvoiceNumber into one draft bill (or credit note when *UnitAmount is negative).
*ContactName,*InvoiceNumber,*InvoiceDate,*DueDate,Description,*Quantity,*UnitAmount,*AccountCode,*TaxType,TaxAmount,Currency
Aire Valley M&E Contracting Ltd,VAL-04-2026,25/10/2026,24/11/2026,PKG-ME04 - Valuation 4 - First-Fix Containment & Distribution,1,4800.00,300,20% (VAT on Expenses),960.00,GBP
Aire Valley M&E Contracting Ltd,VAL-04-2026,25/10/2026,24/11/2026,RET-05 - Less 5% Contract Retention Held to Practical Completion,1,-240.00,300,20% (VAT on Expenses),-48.00,GBPField-by-field contract · 8 mapped columns
Source-to-target field mapping table.
Computed mapping from Subcontractor Stage Valuation Invoice PDF headers (Ref, Item Description, Qty, Rate, VAT %) onto Xero Bills Import CSV headings.
| Source PDF header | Canonical schema field | Xero Bills CSV column | Status | Normalisation & transformation rule |
|---|---|---|---|---|
| Header: Supplier | meta.supplierName | *ContactName | Required | Extracted from supplier header block and repeated on each line row |
| Header: Document No | meta.documentNumber | *InvoiceNumber | Required | Groups all line rows under one Xero bill / credit reference |
| Header: Date / Terms | meta.invoiceDate | *InvoiceDate | Required | Normalised to DD/MM/YYYY; *DueDate computed from terms when absent |
| Ref | sku | Description | Required | Prefixed <SKU> - <Description> (or mapped to InventoryItemCode) |
| Qty | quantity | *Quantity | Required | Positive decimal quantity; credit sign carried on *UnitAmount |
| Rate | unitPrice | *UnitAmount | Required | Strip '£' & ',' thousands; keep exact 2-decimal minor units; line discounts folded to <= 4 decimals |
| Chart Default (300) | config.accountCode | *AccountCode | Required | Defaults to 300 (Purchases) or buyer's nominal code override |
| VAT % | taxRate | *TaxType | Required | Mapped to exact Xero rate (20% (VAT on Expenses), Zero Rated Expenses) |
Document layout behaviour · Subcontractor Stage Valuation Invoice PDF
Construction stage application/invoice showing certified period work done followed by a negative percentage retention deduction row (-5%).
Deterministic verification
Arithmetic & importer validation checks.
AI assists only with messy layout recovery when needed; every numeric cell, line total, tax band and CSV column rule is verified by deterministic code before export.
English (Construction Stage Application & Retention) header matching & decimal normalisation
Maps raw PDF column tokens ("Ref", "Item Description", "Qty", "Rate") onto canonical schema fields via multilingual synonym lookup plus fuzzy token similarity, stripping '£' and ',' thousand groups without floating-point rounding.
Minor-unit row extension & document footer reconciliation
Signed deduction lines (-£240.00 retention) are summed with positive valuation lines (£4,800.00) and reconciled penny-exact against the certified payment notice total (£4,560.00 net). Commercial half-up and banker's half-even tie cases plus per-line vs per-document tax rounding are tested explicitly and reported in the validation log.
Weighted extraction confidence gate before export
Reads embedded PDF vector text coordinates first; invokes page-image OCR only on scanned or garbled pages, and flags any row whose column-edge alignment or numeric parse rate drops below threshold.
Xero Bills CSV importer rejection guard (comma (,), UTF-8)
Xero matches column headings case-sensitively (*InvoiceNumber, *UnitAmount, *AccountCode, *TaxType); wrong letter case or an unmapped *TaxType label rejects the import.
Scope & boundaries
Operational limits & technical questions.
Plain statement of what this conversion checks and produces, alongside common importer questions.
What this conversion does not do
- Does not push records directly into your live Xero Bills CSV account over API — you receive the import-ready CSV file and validation workbook to review and upload via Xero › Business › Bills to pay › Import.
- Handwritten margin annotations, faded carbon-copy scans below 150 DPI, or password-locked PDFs that forbid text and image rendering cannot be verified deterministically and are flagged rather than guessed.
- Chart-of-accounts nominal codes and Xero Bills CSV tax rate names use sensible defaults (such as 300 / 5000 / SKR03 3400) and should be matched to your organisation's ledger before posting.
- Validation proves internal document arithmetic and CSV schema conformance; it is not statutory tax, audit or bookkeeping advice.
How are Subcontractor Stage Valuation column headers mapped to Xero Bills CSV?
What happens if a row on my Subcontractor Stage Valuation PDF fails the arithmetic or format check?
qty × unitPrice − discount = lineTotal) and reconciled against the printed subtotal and tax block. Any row with even a 0.01 discrepancy is highlighted in the companion XLSX audit report with the exact expected vs printed delta instead of being silently altered.Does the free preview run on my actual Subcontractor Stage Valuation PDF?
Which files are included alongside the Xero Bills CSV export?
Connected specifications
Related PDF & importer conversions.
Explore alternative target CSV schemas for this PDF format, or other supplier documents that map into the same importer.
Same PDF source → Other importers
Other targets for Subcontractor Stage Valuation Invoice PDF
Other PDF sources → Xero Bills CSV
Other documents mapping to Xero Bills Import CSV
Ready in under 5 minutes
Run a free preview on your PDF.
Inspect mapped Xero Bills CSV columns and row-level arithmetic checks on your own Subcontractor Stage Valuation Invoice PDF before paying the fixed £30 one-off fee.